Friday, 19 August 2011

Jarvis Foresters Development, August 19 Visit

Mainly sunshine greeted me on this visit to the site, and it was obvious even more roof was tiled. When I went down to the basement, it was now storing plasterboard and double-glazed window units. A supporting structure to take a large tank was now ready and more signage was going up, as well as other electrical wiring.

Within the main buildings partitioning was well-advanced and electric cable was being threaded through prior to the installation of the plasterboard. The Retail area had more wooden roof structures up, and behind the main area a curved wall was now up.