After a frosty night, Harpenden was blessed with sunshine, and when I arrived on site after just a week, it was up another level, and work was being carried out in all four corners. Aluminium staircases replaced ladders in several areas.
Shortly another level of concrete will be poured, the shuttering was under construction and the reinforcing would soon be down. By the entrance a JCB was filling a truck with spoil, and in the basement area, much of the ground area was now covered in concrete. The far end of the site was a vast open storage area.