Welcome

I am Rod Wynne-Powell, and this is my way to pass on snippets either of a technical nature, or related to what I am currently doing or hope to be doing in the near future.

A third-person description follows:
Professional photographer, Lightroom and Photoshop Workflow trainer, Consultant, digital image retoucher, author, and tech-editor for Martin Evening's many 'Photoshop for Photographers' books.

For over twenty years, Rod has had a client list of large and small companies, which reads like the ‘who’s who’ of the imaging, advertising and software industries. He has a background in Commercial/Industrial Photography, was Sales Manager for a leading London-based colour laboratory and has trained many digital photographers on a one-to-one basis, in the UK and Europe.
Still a pre-release tester for Adobe in the US, for Photoshop, he is also very much involved in the taking of a wide range of photographs, as can be seen in the galleries.

See his broad range of training and creative services, available NOW. Take advantage of them and ensure an unfair advantage over your competitors…


View any Gallery by Clicking the relevant TEXT Headline

Showing posts with label Jarvis development. Show all posts
Showing posts with label Jarvis development. Show all posts

Wednesday, 5 January 2011

Sun Greets the Workers Return to Harpenden Site

After the snow, frost and Christmas, work resumes pouring concrete in sunshine for most of the morning. The site was alive with everyone working hard to make up for lost time. Toureen’s site office cabin had been transferred over to the slab, re-inforcing steel rods were being bound together, shuttering being prepared, concrete being poured, levelled and smoothed; the levels being assessed from the concrete already laid using a Laser Leveller.

After one area had been smoothed, the compressor and water spray were lifted by crane to a new location, to keep the concrete watered whilst being levelled and smoothed. I am sure the sunshine helped to keep spirits up, but certainly back in Caddington by the afternoon the rain had arrived.

Monday, 15 November 2010

A Tower Crane Comes to Harpenden

Jarvis are working on a fair-sized site just behind the High Street at the north end of the town.

It is as you enter from Luton that you first glimpse the crane towering above the trees, but it is hard to grasp why it is necessary for such a tall crane. As you come closer the reason becomes apparent, the site is long and thin and to deliver concrete to where it is needed and avoid the concrete mixers from unnecessarily interfering with local traffic these mixer vehicles approach down a tiny alleyway to the edge of the site then feed a hopper which is then hoisted and swung to where it is needed. A lower crane cannot move in these confined spaces, but a taller one can because the angle of the arm is so steep.

The hopper has an elephant’s trunk to pour the concrete where it is needed, and an ingenious tilting skid allowing it to be filled directly in manageable doses directly from the mixer lorry. The mixer is therefore present for the entire time it takes for the hopper to be filled and emptied until the nixer’s entire content is exhausted, so it is a three-man operation: the driver, a signaller to let him know when to pour and when to stop whilst the third man folds the trunk and tips the hopper and swivels the chute. To minimise the amount of concrete spilt on site, there is a skip at the side to deal with the dregs after each delivery to the hopper.

I have tried to capture the elements of the process and to convey just how tall this crane is and what a splendid piece of kit it is with its smart cab, all its cables and counterbalances, and how the operator has a bird’s eye view of both ends of the hopper’s travel from mixer to where it is being poured over the mesh of steel reinforcing cages. It is a non-stop process, except for when the mixer has to drive out when its load is finally exhausted, and another has to take its place.

Work – I could stay and watch it all day! Well, photograph it!